Nico Life Command Center

Source layer + shared services | 2026-11-29 | 2026-Q4 closes in 32 days | 2026-W39 scorecard
Open Loop Pressure
154
Open to-dos in the Nico Life repository.
119 overdue; 17 high priority.
Arete Reporting
No row
Reported weekly health metrics in 2026-W39.
Missing data stays visible; the generator never carries values forward.
Tyche Pressure
25
Open wealth, property, revenue, and capital signals.
Local property detail stays in its owning system; Nico Life shows the rollup pressure.
Philia Reporting
0
Missing weekly relationship metrics.
Relationship work remains owner-led by Muhan.
TEC Queue
40
Open technology and Yanke-owned workstreams.
36 are overdue.
Incubator Queue
12
Active non-Rock projects being proven in the life OS.
3 additional quarterly Rocks are active.

Active Systems

Control health is derived from current exceptions, reporting coverage, and Rock status.
28%
Nico Life
Muhan / Krystel / JeannSource Layer
163 open signals; 114 overdue; 20 high priority.
61%
Eudy
Krystel / Jeann / MuhanCompany Boundary
7 open signals; 5 overdue; 0 high priority.
70%
Providence
Miko / Corri / MarkPortfolio
6 open signals; 3 overdue; 0 high priority.
65%
Patio 108
Miko / Yanke / MuhanSubsystem
3 open signals; 1 overdue; 1 high priority.
85%
mhz / Fund
MuhanOwner Led
2 open signals; 0 overdue; 0 high priority.
53%
Family / Philia
Muhan / Sherry / NancyPersonal
22 open signals; 17 overdue; 2 high priority.

Operating Surface

Process health on the left; ranked action pressure on the right.
Core Process Scorecard
Current exceptions across Arete, Tyche, Philia, ADM, TEC, and Integration.
6 Red
Arete
Health, body, sleep, training, recovery.
Muhan
4 open issues; 11 overdue to-dos
Red
Book Allergist: Dr. Howard Menikoff — due Sep 14 (31 days overdue)
Tyche
Wealth rollups across business, property, and fund systems.
Yanke
4 open issues; 14 overdue to-dos
Red
Decide eviction filing vs grace for 22 Barbara St 1st floor tenant
Philia
Relationships, family, dating, community, and presence.
Muhan + Sherry
1 open issues; 16 overdue to-dos
Red
Reply to Andy Jan and RSVP for his 40th (Apr 9-12, 2027)
ADM
Inbox, calendar, routing, logistics, L10 prep, and personal admin.
Yanke
1 open issues; 11 overdue to-dos
Red
Follow up with Good Health Psychiatric billing after missed call
TEC
Accounts, devices, automations, credentials, servers, and agents.
Yanke
2 open issues; 23 overdue to-dos
Red
Enable physical-input priority over RustDesk remote control
Integration
Rocks, issues, scorecards, cross-repo routing, and operating cadence.
Muhan
4 open issues; 47 overdue to-dos
Red
Yanke: standardize the Codex to-do workflow and make repo to-do lists usable (UDC check + simple GUI view)

Incubator And Graduation Queue

Active non-Rock projects being proven before graduation or promotion to a Rock.
ACQ Vantage Mastermind
Integration
Program: ACQ Vantage Mastermind (Acquisition.com / Mosey community) Lead: Alex (from Mosey's / Hormozi community) + Caio Beleza (vantage@acquisition.com) Focus: Real estate co-investments, acquisition strategy, wealth-building systems Plat...
0/7 stepsMuhannico / mhz
Agentic Inbox CODE Triage
ADM
SOP current retry and recovery now records the executable fresh-pipeline composition and stable source-bound delegated-request carryover. A current terminal partial producer record composes successfully; real retained failure→exact readbac...
15/15 stepsMuhannico
Patio108 Airbnb Weekly EOS Dashboard — Usage Summary
Tyche
Source Drive title: Patio108 AIRBNB Weekly EOS Dashboard Source: Google Sheet Drive path: My Drive/Life/2. Areas/Airbnb Management Google account: muhanz@gmail.com Drive modified: 2026-09-18 14:00:17 UTC Synced: 2026-09-18 14:13 UTC Sync t...
ActiveMuhannico / patio
Capsule Wardrobe — Closet Reset
Integration
Fused while packing for Asia 2026, 2026-06-28. The trip is the live test.
0/4 stepsMuhannico
Commercial Acquisition — the 2-Year Search
TEC
The long-running hunt for the commercial "burn." Muhan's frame (2026-08-21 Eudy sync, routed here): "We spent two years looking for the commercial burn — if we can close out the deal, we finish this task."
ActiveYankenico
Project Cyber-Attack 2026 — Executive Summary
TEC
Owner: Muhan Zhang · Security lead: Yanke (CTO) Source: Posted by Muhan in #project-cyber-attack-2026, 2026-06-20
Diagnosis Complete · Remediation Spec Ready · Implementation Targeted For Q3Muhan Zhang · Security lead: Yanke (CTO)nico

Primary Docs

Source links open the canonical repository documents.